金凤凰彩

    <strike id="1pxt9"></strike>

    <form id="1pxt9"></form>
    <noframes id="1pxt9">
    <form id="1pxt9"></form>

    
    

      <address id="1pxt9"></address>
      <form id="1pxt9"><th id="1pxt9"><progress id="1pxt9"></progress></th></form>
      <form id="1pxt9"></form>
      <form id="1pxt9"><th id="1pxt9"><progress id="1pxt9"></progress></th></form>

        <noframes id="1pxt9">

        <noframes id="1pxt9">

          <noframes id="1pxt9">

          3" Icedrill

          Movie: Ice core drilling at the Jungfraujoch (from the Paul Scherrer Institute)

           

          Svalbart:

           March 2009



          Colle Gniffeti:

           September 2003



           

          Piz Zuppo:

          March 2002

           

          Drilling at Illimani (6400 masl).

          25th Mai - 6th June 1999
           

          Two 3 Inch Ice Core Drills at base camp

          Two baseplates on the way to Illimani

          Two 3 Inch Ice Core Drills at Illimani

          View into the Ice Cap of Illimani

          Drillhead after contact to bedrock
           

           

           

          Drill tests at the Jungfraujoch:

          1998


          Drill with Tent for Protection against sun, wind and snow (tent is a extra option).

          Drill with Shadow Sail



          2" Icedrill

           Drilling at the Aletsch glacier:

          Test of the surface sample drill in temperated ice.
          This drill is basically the 2" drill with a simplyfied drive.

           

          Drilling in the Glaciere de la Molesi:

          Ice core recovered from a ice cave in the
          swiss jura.

          Poor core quality due to a lot of stones in the ice.

           

          Test at the Jungfraujoch:


          Complete drill with transportation protection

          Put the drill together

          Check the clutch

          Check the cutting ring

          Drilling

          Break the core

          Open the clutch

          Remove the icecore

          Seperate the chips barrel

          Remove the drillchips


          Drilltent:

           
          Erection at Lomosonovfonna (Svalbart)
          the 03/22/2009

          Ambient temperature below -20°C

          Start time 16.10
          End time 17.20

          03/22/2009 16.17

          16.18

          16.26

          16.27

          16.50

          17.00

          17.01

           

          17.25

           

           

           

            

           

           

           

           

           At the Jungfraujoch:    

           

           

           

           

           

           

           

           

           

           

           

          Home
           

          d.stampfli
          Copyright © 2010 wap.zzssd.com.cn AG.
          Date: 07/20/10
            <strike id="1pxt9"></strike>

            <form id="1pxt9"></form>
            <noframes id="1pxt9">
            <form id="1pxt9"></form>

            
            

              <address id="1pxt9"></address>
              <form id="1pxt9"><th id="1pxt9"><progress id="1pxt9"></progress></th></form>
              <form id="1pxt9"></form>
              <form id="1pxt9"><th id="1pxt9"><progress id="1pxt9"></progress></th></form>

                <noframes id="1pxt9">

                <noframes id="1pxt9">

                  <noframes id="1pxt9">

                  news

                  Premier League

                  Buddhism

                  search for

                  city

                  Mobile Games

                  culture

                  Buddhism

                  explore